2030 Comprehensive Plan Update, April 2024
Action Matrix I: All Items
Capital Funds
Needed (Y/N)
Y
N
Y
Y
Action AP AB.5 Hillsborough Street Sidewalk ES Short-term Systems/ support Action AP AB.6 Greenway Connections PRCR, PLANDEV Mid-term Study/plan N Y Y Y
Action AP AB.8 Trinity Road Streetscape RDOT Long-term Study/plan Y
Action AP AB.11 Trinity Road Streetscape Plan RDOT, PLANDEV Long-term Study/plan N Action AP AB.12 Arena Area Bus Line GR, GT Long-term Systems/ support Y
Number Action Responsible Agency Time Frame Action Type SECTION 16. LOCAL AREA GUIDANCE AP-AB. Arena-Blue Ridge Action AP AB.1 Complete Streets RDOT, PLANDEV Long-term Systems/ support Action AP AB.2 Speed Limit RDOT Short-term Systems/ support
Action AP AB.3 Wade Avenue Bridge RDOT, NCDOT, PRCR Long-term Systems/ support
Action AP AB.4 Lake Boone Trail Bike Lanes RDOT Mid-term Systems/ support
Action AP AB.7 Lake Boone Trail Extension RDOT Mid-term Systems/ support
Action AP AB.9 Arena Area Sidewalk Width RDOT Long-term Systems/ support Action AP AB.10 Removed 2019
17-66
Made with FlippingBook Ebook Creator