Cityworks SR and WO
• ••
",.
..:J Repair Hydrant
Work Order 10: 28
rActua l r.Estimated
r r
Units Cost
Materi,lld
Description
HardHat221
Heavy ballistic IlOrd hat
1.00
$122.00
r LeatherGlov.,S399 Heavy' leathergloves with steel joint protection 0.50
$82.50
.1
1
~i
I filA
II Delele
II Transfer
I New
~ .m. . Iilitiai
....
.:J
~
Storeroom: NIA
Search By:
I Find
I
Keyword:
r r r
Description
Unit Unit Cost
UID
Heavy ballistic hard hat
HardH.t221
EA
122.00
L"therGlovesS899
165.00
PI Heavy leather gloves with steel joint protection · 1 ~J 1 r. Asset s r Tasks r r .1 I Asset A",tId Work Co Warranty Date Location WHYDRANT 0 False ~ 1 I Highlight Selected Assets 2. At the top of the Material panel, select either the Actual or Estimated radio button. By default, the Actual radio button is selected . NOTE: If material has been added as an EstImated entry, it can be copied to Jlctual by clicking the Estimated radio button and then clicking on the Estimated material entry to highlight it and then clicking ryan" " . This copies the Estimated material to the Actual material panel. 3. In the Material/Entity/Task panel, select the desired material by checking the box to the left to highlight it. You can also search for material by name, predefined list, crew, my crew, or hierarchy. NOTe: If the desired material is not shown, make sure that the Vlewsble In Server check box for that material is cllecked in Designer. 4. To associate the material with assets or tasks, select the Assets or Tasks option in the Material/Entity/Tasl( panel. Highlight the desired material and select the asset(s) or task(s) to associate to the material. If the Assets option is selected, click Highlight Selected Assets to mark the selected asset(s) on the map. 5. Once the material has been highlighted, enter the material details in the Details panel. 100 0 Section 5: The Work Order Server AMS 2013 SP1 End User Training Manual
Made with FlippingBook