Quail Creek

Easement Work Plan

• Ouail

CORPUD Sewer Maintenance Division

Quail Creek Easement Bank Stabilization & Restoration

AREA OF OPERATION

AFFECTED CITIZEN NOTIFICATION NO CITIZENS DIRECTLY AFFECTED

1909 CARRBRIDGE WAY Door hangers given to these residents

8401 CALDBECK DR

SALISBURY PARK HOMEOWNERS ASSOCIATION

8121 BLUFFRIDGE DR

SCOPE OF OPERATION

Raise MH 3’

Construction Entrance

Raise MH 6”

Touch up Class 7 and Class B

BANK RESTORATION 2

TEMPORARY CREEK CROSING 1

DEBRIS REMOVAL

CONSTRUCTION ENTRANCE

Replace netting and reseed

BANK RESTORATION 3

120’ of stabilization

TEMPORARY CREEK CROSSING 2

Install 24”x30’ permanent crossing

Install 24” x 30’ permanent crossing

BANK RESTORATION 1

Install 24” x 30’ permanent crossing

TREE REMOVAL

-Install 2 construction entrances -Raise SMH129063- 3’ -Raise SMH139842- 12” -Raise SMH174571- 6” -Touchup rock on NW corridor -120’ of bank stabilization -3 permanent crossing installations

Raise MH 12”

Construction entrance

WZTC Requirements

Description

A – Trucks Entering Highway

A / Windy Hill- 200’ on either side of entrance A2 / Old Wake Forest Rd-350’ on either side of entrance

PROPOSED WZTC

PERMANENT CREEK CROSSINGS

TCC-1

TCC-2

WINDY HILL BANK RESTORATION

OLD WAKE FOREST RD BANK RESTORATION