Unified Development Ordinance, 30th Supplement, November 2023

CHAPTER 3. ​MIXED USE DISTRICTS | Article 3.2. ​Base Dimensional Standards

Sec. 3.2.5. General Building

A4

Alley

F2 F1 F2

Alley

D1

A1/A2

C3

C4

B4

E2 E1 E2

B3

F3

Building Setbacks

A3

C2

Primary Street

Primary Street

C1

Parking Setbacks

B2

B1

Side Street

Side Street

OP-, OX- NX-, CX-

OP-, OX- NX-, CX-

DX-

IX

DX-

IX

D. Height D1 Principal building (max) D2 Accessory structure (max)

A. Lot Dimensions A1 Area (min)

Set by district Set by district Set by district

n/a

n/a

n/a

10 acres (NX- only)

26'

26'

26'

A2 Area (max)

n/a

n/a

E. Floor Heights E1 Ground story height, floor to floor (min) E2 Upper story height, floor to floor (min)

n/a

A3 Width (min)

n/a

n/a

11’

13’

11’

A4 Outdoor amenity area (min) B. Building/Structure Setbacks B1 From primary street (min)

10%

10%

10%

9’

9’

9’

F. Transparency F1

5' 5'

3' 3'

3’ 3’

Ground story (min) Upper story (min) Blank wall (max)

33% 20%

50% 20%

20% 20%

B2 From side street (min) B3 From side lot line (min) B4 From rear lot line (min) C. Parking Setbacks C1 From primary street (min) C2 From side street (min) C3 From side lot line (min) C4 From rear lot line (min) B4 From alley

F2 F3

0' or 6' 0' or 6'

0' or 6' 0’or 6’

0’ or 6’ 0’or 6’

30’

30’

50’

See Sec. 1.5.4.D “Building Setbacks” for specific building element requirements.

5’

5’

5’

10' 10'

10' 10'

10’ 10’

0' or 3' 0' or 3'

0' or 3' 0' or 3'

0’or 3’ 0’ or 3’

C5 From alley (min)

5'

5'

5’

Supp. No. 30

3 – 8 Published November 2023

Part 10: Unified Development Ordinance City of Raleigh, North Carolina

Made with FlippingBook Ebook Creator