Action AP MT.3 Stormwater Drainage Basin Study ES Mid-term Study/plan N Action AP MT.4 Street Network RDOT, ES Mid-term Study/plan Y Action AP MT.5 Millbrook Road Study RDOT Mid-term Study/plan N
Action AP MT.6 Six Forks School and Connectivity Study RDOT Mid-term Study/plan N Action AP MT.7 Wake Forest Road Corridor Reconditioning Study RDOT Mid-term Study/plan Y
Action AP DW.9 Completed 2016 Action AP DW.10 Boylan Avenue Pedestrian Connection RDOT, ES, PLANDEV, GT Long-term Study/plan N Action AP DW.11 Removed 2022 Action AP DW.12 Rosengarten Street Extension RDOT, PLANDEV Long-term Systems/ support N Action AP DW.13 Removed 2019 AP-MT. Midtown Action AP MT.1 I-440 Bridges ES Mid-term Study/plan Y Action AP MT.2 Green Streets RDOT, ES Mid-term Study/plan Y
Capital Funds
Needed (Y/N)
Number Action Responsible Agency Time Frame Action Type
Action AP DW.6 Removed 2014
Action AP DW.7 Removed 2019
Action AP DW.8 Completed 2012