Caldbeck Dr
WZTC Requirements
Description
A
A - UTILITY WORK AHEAD
A / 600 ft. north of intersection of Carrbridge Way and Briegeport DR. A2 / 600 ft. south of intersection of Carrbridge Way and Briegeport DR
B
B - LANE NARROWS (optional)
+150 ft south bound of WZTC A
C
C - BE PREPARED TO STOP
C / +150 ft south from WZTC B C2 / +200 ft north bound from WZTC A2
F
D
D - FLAGGER AHEAD
• Intersection of Carrbridge Way and Briegeport DR. • Flagger applicable only for controlling constructions vehicles and equipment arriving and departing from construction entrance • D /-150 ft south bound WZTC C • D2 / +600 ft north bound WZTC A2
E
D2
F
E - CONSTRUCTION ENTRANCE (optional)
C2
F -Channelizing devices set for narrow lane and roadside staging area om ROW
Utilize MUTCD for proper placement of channelizing devices based on 35 MPH posted speed limit Use TA-6 Ensure that there is at least 10 ft. of ROW for undisrupted traffic flow
A2
PROPOSED WZTC